The right location, run the right way.
Both are our job.
We find the location, we analyse it, we build it and we run it day to day. The investor's only job is to make the investment decision — we carry the rest.
Everything the investor doesn't take on sits with us
Building a charging site is not just buying a charger. The location has to be found, the electrical capacity worked out, the permits obtained, the build done and the site run every single day. All of that is ours.
Finding and assessing the site
- We scan candidate points in the area and measure passing traffic
- We work out the electrical capacity and transformer cost in advance
- We assess competitor density and pricing nearby
- We benchmark against the real data of our nine running sites
Build and commissioning
- Grid application, permits and switchboard work
- Ground marking, bollard protection, lighting
- Charger installation, testing and network connection
- Our own installation crew — no subcontractors to chase
Day-to-day operation
- 24/7 remote monitoring, same-day fault response
- Tariff management and campaign design
- Customer call centre and complaint handling
- Monthly settlement report and raw transaction export
A site earns for two reasons: the right place and the right operation
A good location run badly stands idle; a well-run site builds its own regulars over time. Across our nine DC sites, 96% of sessions started in the last 30 days completed with energy delivered — that continuity is what pays the investment back.
Three partnership models
Do you have the site, the capital, or both? As the split of responsibility changes, so does the base the share is calculated on.
MODEL 1
I have the site,
I fund it myself
You finance the charger and the build, the site is yours. We provide the licence, the network and the operation.
Share base
Turnover excl. VAT
Our share is calculated on sales; the electricity cost stays with you.
- Sub-licence — you never enter the licensing process
- Network software, collection, call centre
- Charger ownership stays with you
- Lowest operating share
- Survey and feasibility report
- Installation and commissioning
- 24/7 monitoring and remote intervention
- Monthly energy, sales and collection report
- Customer call centre
- Contract term 5–10 years
MODEL 2
I have capital,
not a site
You make the investment, we find the location. The site contract is held by ADZE.
Share base
Turnover excl. VAT
Because we take on the site cost and the site risk, our share is higher.
- Site research and feasibility from us
- Site contract and landlord relationship with ADZE
- No suitable site, no investment starts
- Charger ownership stays with you
- Site contract and rent relationship with us
- Survey, permits and grid applications from us
- Installation and commissioning
- 24/7 monitoring and remote intervention
- Monthly one-page settlement report
- Contract term 5–10 years
MODEL 3
I have the site,
let ADZE fund it
You provide the area, the charger and the build are on us. You commit no capital.
Share base
Gross profit after electricity
You take a share of the profit left after the electricity cost is deducted.
- Zero investment, zero operating load
- Electricity cost deducted before the calculation
- Installation, maintenance and faults with us
- Your area starts producing income
- Charger, build and infrastructure entirely from us
- Electricity subscription and bill with us
- Maintenance, faults and spare parts with us
- Monthly settlement and expense note
- No obligation beyond your area
- Contract term 5–10 years
The charger we install
180–240 kW, twin CCS2 sockets, two cars at once. The body carries ADZE branding; on-site visibility is part of the investment too.

Front
Ad screen, contactless payment, emergency stop

Angled
Twin cables, status strip, ADZE body wrap

Rear
Second socket — two cars charge at once



If the charger does not run, neither does the investment
The most expensive thing for an investor is an idle charger. Across our network, 96% of charging sessions started in the last 30 days completed with energy delivered. To be able to attend a fault the same day we deliberately kept our service area tight: Marmara and the Aegean.
96%
sessions delivered
183
charge points
2,440
monthly customers
Four-year trend at a busy location
Energy sold per year (kWh). A band derived from the actual trend of our own DC sites: on average a 1.8× rise from year one to year two, then a plateau. It is not the literal data of any single site.
You watch your own site, every day
You don't have to wait for month-end. Is your charger running right now, how many sessions today, how many kWh sold — it's all in your own login. You never have to take the number from us.
Live charger status
Charging, idle or faulty right now. If there's a fault you see it before we do.
Daily sales and kWh
Each day's session count, energy sold and amount. You can even see the weekend effect.
Monthly settlement report
Sales, electricity, shares and the amount payable to you on one page — as soon as the month closes.
Raw transaction export
Every single session listed and downloadable. You can do your own arithmetic.
The portal is transparency, not supervision
A dashboard on its own does not replace an independent financial audit. That is why we also hand over the raw transaction export — you can have your own accountant check it. Most competitors have a portal; what makes the difference is whether the data behind it is shared too.
First we talk about what the site will actually do
The rate and the model are settled last. Because what sets sites apart is not the rate — it's the location decision.
- 1
Application
Are you a site owner or an investor, which city, what kind of site, your budget range.
- 2
Pre-screening
We produce a rough volume band from the real data of comparable sites of ours. Free of charge.
- 3
Survey
Electrical capacity, transformer cost, visibility, access hours, competitor density nearby.
- 4
Investment decision sheet
One page: budget, term of use, break-even sales, two scenarios — and the conditions under which the investment WOULD BE REJECTED. No competitor's offer carries that line.
- 5
Model choice and written offer
The rate is settled here. Scope of service, maintenance limits and term are given in writing.
- 6
Contract, build, reporting
After the build, monthly energy, sales, collection and share appear in a single report.
For now, Marmara and the Aegean
We work around İstanbul, Bursa and İzmir. The reason is simple: when there's a fault we need to be on site the same day. Rather than promise the whole country and fail to turn up, we say plainly where we can serve.
We do look at requests outside the region; but before committing to anything we talk through our service reach.
Investment band
USD 25,000–35,000 for a 120–240 kW charger and its installation. The exact budget is given after the site survey, in the written offer.
Contract term
5–10 years. Charger ownership stays with the investor in Models 1 and 2.
Maintenance
Chargers carry a 2-year warranty with maintenance included. After the warranty, maintenance is a separate item and is shown explicitly in the offer.
Payback period
It varies by location and quoting a single average would be misleading. After the survey we calculate two scenarios for your own site.
Frequently asked
How long does a charging station investment take to pay back?
Quoting a single figure would be misleading. Between our own sites, monthly sales differ by up to 20× — same charger, same price. We calculate payback only after surveying your location, as a low and a mid scenario.
Which model suits me?
One question separates them: what do you have? Both the space and the capital — Model 1. Capital but no space — Model 2, we find the site. Space but no capital — Model 3, we make the investment and you take a share.
How much investment is needed?
It depends on the power class; for a 120–240 kW charger and its installation the rough band is USD 25,000–35,000. Electrical infrastructure, a transformer upgrade and site conditions can move that band. The exact budget is given after the survey, in the written offer.
What if my location isn't suitable?
We tell you so. Pushing an investment onto an unsuitable site means a charger sale for us in the short term and an unhappy partner in the long term. Saying no is part of the service.
Do you work everywhere in Turkey?
For now, Marmara and the Aegean — around İstanbul, Bursa and İzmir. When there's a fault we need to be on site the same day. We do look at requests outside the region, but before committing we talk through our service reach.
Let's assess your location
Pre-screening is free. We produce a volume band from the real data of comparable sites of ours — and if we don't find it suitable, we say so.
EV Charging Station Investment Opportunities
Invest in EV charging stations with ADZE Charge and capture share of the growing EV market. As a network operator across 50+ locations in Türkiye, we offer turnkey installation, EPDK licensing support, and revenue-sharing models.
Investor Advantages
- Zero-investment revenue-sharing model
- Free feasibility and location analysis
- EPDK certification support
- 24/7 technical support and maintenance
- Feasibility and volume estimate shared in writing